11 mei 2008

T.O.T.

Oh YES!!!

Live from Deuil la Barre, France!

Presenting to you.....

Team...
On...
Track...!!!!!

Presenting the team members:
Peter Zuijdwijk aka Fix It!
Carole Wichers Quintard aka Dieselpower!
Freeeeeeeeeeeerk Wichers aka Hyper Hyper, We Got To Do It!!!!

Planning prepared in early May for finalising first phase installation.
Definition of first phase installation = Bedroom installation.
Meaning:
- no more ground floor sleeping ( but after 4 months you realise you're fine without bed as well, so f... luxury)
- no more going down the stairs for taking a piss
- no more delayed stairways to heaven (=35 stairway steps to go to bed)
- getting the 18 boxes of cloths sorted
- no more jumpers and ski socks during summer temperatures
- potential invitees can become invitees

Peter managed to fix the stuff that was planned, main items being;
Getting our split lounge become one,
Being able to flower the massive garden,
Have the first class terras be visible,
Power in the place!!!!
No more watherfalls in the basement....

So it was time that Carole and myself got our act together!
We painted two bedrooms, finished painting in the kitchen (amongst others the backdoor), toilet, and some struffy stuff (for instance getting all the dirt out of the place).

Next two weeks we're up for getting the floor done at the first floor. And then we can get installed in the bedroom and have a second bedroom ready!!! Oh JOY!!!

Check the pictures to get it all visualised (fourth month in Tha House!)

For four nights in a row we got the barbeque out!

FAN-TAS-TIC!

Sitting on our terras in the evening.
It feels like holiday every day!